Dietrich Idaho Drinking Water Project 2013-2014

Dietrich Idaho Water System Priority Improvements

Dietrich Idaho | Public Works




10-07-2013, Trenching, Hammering Rock

10-07-2013, Dietrich Idaho water project. Hammering rock for trench excavation. 

 

10-08-2013, Trenching, Hammering Rock

10-08-2013, Dietrich Idaho water project. Hammering rock for trench excavation. 

10-09-2013, Trenching, Hammering Rock

10-09-2013, Dietrich Idaho water project. Hammering rock for trench excavation. 

10-10-2013, Trenching, Hammering Rock

10-10-2013, Dietrich Idaho water project. Hammering rock for trench excavation. 

10-11-2013, Trenching, Hammering Rock, Water Witching

10-11-2013, Dietrich Idaho water project. Hammering rock for trench excavation, water witching to find buried water line. 

10-14-2013, Survey Crew, Hammering Rock, Fence Building

10-14-2013, Dietrich Idaho Water Project. Riedesel survey crew, rock hammering, fence building, pipe locating. 

10-15-2013, Survey Crew, DEQ Inspection, Fence Building

10-15-2013, Dietrich Idaho Water Project. Riedesel survey crew, deq inspection, fence building. 

10-16-2013, Trenching, Hammering Rock & Repair Work

10-16-2013, Dietrich Idaho water project. Hammering rock for trench excavation. Replace chisel on rock hammer. 

10-17-2013, Trenching, Hammering Rock

10-17-2013, Dietrich Idaho water project. Hammering rock for trench excavation. 

10-18-2013, Freeing Stuck Truck

10-18-2013, Dietrich Idaho water project. Pulling stuck truck over large gravel piles. 

10-21-2013, Trenching, Hammering Rock, Receive Parts

10-21-2013, Dietrich Idaho water project. Hammering rock for trench excavation, receiving pipe for project. 

10-22-2013, Trenching, Hammering Rock, Project Inspection

10-22-2013, Dietrich Idaho water project. Hammering rock for trench excavation, project inspection by Idaho DEQ, Keller Engineering, Region Four Community Development, Extreme Excavation Contractors and City Officials. 

10-23-2013, Trenching, Hammering Rock,

10-23-2013, Dietrich Idaho water project. Hammering rock for trench excavation. 

10-24-2013, Trenching, Hammering Rock,

10-24-2013, Dietrich Idaho water project. Hammering rock for trench excavation. 

10-25-2013, Trenching, Hammering Rock, Fix Phone Line

10-25-2013, Dietrich Idaho water project. Hammering rock for trench excavation. Phone company repairing damaged line. 

10-28-2013, Trenching, Hammering Rock, Install Valves, Lay Pipe

10-28-2013, Dietrich Idaho Water Project. Hammer rock, install valves, lay pipe, delivery of parts. 

10-29-2013, Trenching, Hammering Rock, Install Valves, Lay Pipe

10-29-2013, Dietrich Idaho Water Project. Hammer rock, install valves, lay pipe. 

10-30-2013, Trenching, Hammering Rock, Lay Pipe

10-30-2013, Dietrich Idaho Water Project. Hammer rock, lay pipe. 

10-31-2013, Trenching, Hammering Rock, Install Valves, Lay Pipe

10-31-2013, Dietrich Idaho Water Project. Hammer rock, install valves, lay pipe, install fire hydrants, pour concrete thrust blocks joint restraints. 

11-01-2013, Backfill Hydrants, Valves, Valve Boxes

11-01-2013, Dietrich Idaho Water Project. Backfill fire hydrants, valves, valve boxes. 

11-04-2013, Lay Pipe, Excavate

11-04-2013, Dietrich Idaho Water Project. Lay pipe, backfill, excavate for valves. 

11-05-2013, Lay Pipe, Install Valves, Backfill

11-05-2013, Dietrich Idaho Water Project. Lay pipe, install valves, install fire hydrant, backfill, excavate. 

11-06-2013, Lay Pipe, Backfill, Install Saddle

11-06-2013, Dietrich Idaho Water Project. Lay pipe, backfill, excavate, install saddle. 

11-07-2013, Lay Pipe, Live Tap Valves

11-07-2013, Dietrich Idaho Water Project. Lay pipe, live tap valves, backfill, excavate. 

11-08-2013, Lay Pipe, Pour Concrete Thrust Blocks

11-08-2013, Dietrich Idaho Water Project. Lay pipe, backfill, excavate, pour concrete thrust blocks. 

11-11-2013, Lay Pipe, Backfill, Install Saddles

11-11-2013, Dietrich Idaho Water Project. Lay pipe, backfill, excavate, install saddles and corp stops, install valve boxes, repair broken pipe. 

11-12-2013, Lay Pipe, Backfill, Install Fire Hydrant

11-12-2013, Dietrich Idaho Water Project. Lay pipe, backfill, excavate, install fire hydrant. 

11-13-2013, Lay Pipe, Backfill, Install Culvert

11-13-2013, Dietrich Idaho Water Project. Lay pipe, backfill, excavate, install culvert, install fire hydrant. 

11-14-2013, Excavate, Lay Pipe, Backfill

11-14-2013, Dietrich Idaho Water Project. Excavate, lay pipe, backfill. 

11-15-2013, Excavate, Pour Thrust Blocks

11-15-2013, Dietrich Idaho Water Project. Excavate, pour concrete thrust blocks, install manhole for air-valve. 

11-18-2013, Excavate, Lay Pipe, Backfill, Test Compaction

11-18-2013, Dietrich Idaho Water Project. Excavate, lay pipe, backfill, test compaction, install pipe fittings. 

11-19-2013. Excavate, Lay Pipe, Backfill, Install Air Valve

11-19-2013. Dietrich Idaho Water Project. Excavate, lay pipe, backfill, install air valve, drill hole in air valve manhole. 

11-20-2013, Excavate, Lay Pipe, Backfill

11-20-2013, Dietrich Idaho Water Project. Excavate, lay pipe, backfill. 

11-21-2013, Excavate, Lay Pipe, Backfill, Inspection

11-21-2013, Dietrich Idaho Water Project. Excavate, lay pipe, backfill, inspection, assemble valves. 

11-22-2013, Excavate, Lay Pipe, Backfill, Install Valves

11-22-2013, Dietrich Idaho Water Project. Excavate, lay pipe, backfill, install valves, mix concrete in portable cement mixer, pour concrete thrust block. 

11-25-2013, Excavate, Lay Pipe, Backfill, Pour Thrust Blocks

11-25-2013, Dietrich Idaho Water Project. Excavate, lay pipe, backfill, mix concrete in portable cement mixer, pour concrete thrust block, trench & hammer rock at well site. 

11-26-2013, Excavate, Lay Pipe, Backfill, Pour Thrust Blocks

11-26-2013, Dietrich Idaho Water Project. Excavate, lay pipe, backfill, mix concrete in portable cement mixer, pour concrete thrust block. 

11-27-2013, Excavate, Lay Pipe, Backfill, Install Meter Vaults

11-27-2013, Dietrich Idaho Water Project. Excavate, Lay Pipe, Backfill, Install Meter Vaults. 

11-29-2013, Flushing, Sampling, Damage Survey

11-29-2013, Dietrich Idaho Water Project. Flushing, sampling, damage survey. 

12-02-2013, Excavate, Lay Pipe, Backfill, Install Meter Vaults

12-02-2013, Dietrich Idaho Water Project. Excavate, lay pipe, backfill, install meter vaults. 

12-03-2013, Excavate, Lay Pipe, Backfill, Install Meter Vaults

12-03-2013, Dietrich Idaho Water Project. Excavate, lay pipe, backfill, install meter vaults. 

12-04-2013, Excavate, Lay Pipe, Backfill, Install Sample Station

12-04-2013, Dietrich Idaho Water Project. Excavate, lay pipe, backfill, install sample station. 

12-05-2013, Excavate, Lay Pipe

12-05-2013, Dietrich Idaho Water Project. Excavate, lay pipe. 

12-06-2013, Excavate, Lay Pipe, Install Fire Hydrant

12-06-2013, Dietrich Idaho Water Project. Excavate, lay pipe, install fire hydrant. 

12-10-2013, Excavate, Lay Pipe, Backfill, Compact

12-10-2013, Dietrich Idaho Water Project. Hammer rock, excavate, lay pipe, install blueboard, backfill, compact. 

12-11-2013, Excavate, Lay Pipe, Backfill, Compact

12-11-2013, Dietrich Idaho Water Project. Excavate, lay pipe, backfill, compact, install meter vaults, load water in main line. 

12-12-2013, Install Meter Vaults, Well Case Delivery

12-12-2013, Dietrich Idaho Water Project. Install meter vaults, well case delivery. 

12-13-2013, Hammer Rock, Locate Pipe

12-13-2013, Dietrich Idaho Water Project. Hammer rock, locate pipe. 

12-14-2013, Hammer Rock, Haul Dirt

12-14-2013, Dietrich Idaho Water Project, Hammer rock, haul dirt. 

12-16-2013, Hammer Rock, Find Valve, Install Conduit

12-16-2013, Dietrich Idaho Water Project. Hammer rock, find valve, install conduit, excavate for concrete pad. 

12-17-2013, Forms For Slab, Construction Meeting

12-17-2013, Dietrich Idaho Water Project. forms for slab, construction meeting with DEQ Engineer Brian Reed, Keller Engineer Justin Walker, Dietrich Mayor Don Heiken, Dietrich Councilman Daryl Ballard, Region IV Development Kathy Uker, Extreme Excavation Craig Christiansen, Jeremiah Southwick, Jake Claridge. 

12-18-2013, Rebar For Slab, Pour Concrete, Dig Hole

12-18-2013, Dietrich Idaho Water Project. Rebar for slab, pour concrete, dig hole, repair manhole. 

12-19-2013, Dig Hole, Flush Water Lines

12-19-2013, Dietrich Idaho Water Project. Dig hole, flush water lines with 79,000 gallons of water. 

12-20-2013, Dig Hole, Flush Water Lines, Lay Pipe

12-20-2013, Dietrich Idaho Water Project. Dig hole, lay pipe, flush water lines with 118,000 gallons of water to get .3 mgL free chlorine. 

01-06-2014, Pressure Test Water Line, Install Meter Vaults

01-06-2014, Dietrich Idaho Water Project. Pressure test water line. Held 150 psi for longer than two hours. Replace three meter vaults and water meters with Sensus iPerl meters, and Mueller coil type meter vault. 

01-07-2014, Pressure Test Water Line, Install Meter Vaults

01-07-2014, Dietrich Idaho Water Project. Pressure test water line. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller coil type meter vault. Re-install twelve inch valve that blew off during pressure test. 

01-08-2014, Pressure Test Water Line, Install Meter Vaults

01-08-2014, Dietrich Idaho Water Project. Pressure test water line. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults. Pour concrete for thrust block for twelve inch valve that blew off during pressure test. 

01-09-2014, Pressure Test Water Line, Install Meter Vaults

01-09-2014, Dietrich Idaho Water Project. Pressure test water line on Waucanza street. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults. 

01-10-2014, Pressure Test Water Line, Backfilled Meter Vaults

01-10-2014, Dietrich Idaho Water Project. Pressure test water line on 7th street. Backfilled Mueller Thermal-Coil meter vaults. 

01-13-2014, Install Mueller Thermal-Coil Meter Vaults

01-13-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults

01-14-2014, Install Mueller Thermal-Coil Meter Vaults

01-14-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults. 

01-15-2014, Install Meter Vaults, Install Fire Hydrant

01-15-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults, install Waterous Pacer fire hydrant. 

01-16-2014, Install Mueller Thermal-Coil Meter Vaults

01-16-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults. 

01-20-2014, Install Meter Vaults, Dig Trench, Install Conduit

01-20-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults. Dig trench at well site for electrical conduit between new well & existing well house. 

01-21-2014, Install Meter Vaults, Dig Hydrants

01-21-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults. Excavate around hydrants & get ready for replacing. 

01-22-2014, Install Mueller Thermal-Coil Meter Vaults

01-22-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults. 

01-23-2014, Install Mueller Thermal-Coil Meter Vaults

01-23-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults. 

01-24-2014, Install Waterous Pacer Fire Hydrants

01-24-2014, Dietrich Idaho Water Project. Replace Clow Medallion fire hydrants with Waterous Pacer fire hydrants. 

01-25-2014, Install Fire Waterous Pacer Hydrant

01-25-2014, Dietrich Idaho Water Project. Replace Clow Medallion fire hydrant with Waterous Pacer fire hydrant. 

01-27-2014, Install Mueller Thermal-Coil Meter Vaults

01-27-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults. 

01-28-2014, Install Mueller Thermal-Coil Meter Vaults

01-28-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults. 

01-29-2014, Smooth, Clean Around Wellsite

01-29-2014, Dietrich Idaho Water Project. Clean & smooth ground around wellsite. 

01-30-2014, Install Mueller Thermal-Coil Meter Vaults

01-30-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults. 

01-31-2014, Install Mueller Thermal-Coil Meter Vaults

01-31-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults

02-04-2014, Install Valves In Wellhouse

02-04-2014, Dietrich Idaho Water Project. Install valves & fittings in wellhouse. 

02-06-2014, Fit Pipe In Wellhouse

02-06-2014, Dietrich Idaho Water Project. Fit pipe & fittings in wellhouse. 

02-10-2014, Install Generator, Backfill Hole

02-10-2014, Dietrich Idaho Water Project. Install generator, backfill hole, begin installing air valve. 

02-11-2014, Install Meter Vault, Pour Concrete

02-11-2014, Dietrich Idaho Water Project. Replace meter vault and water meter with Sensus iPerl meter, and Mueller Thermal-Coil meter vaults. Pour concrete slab in wellhouse. Install air-valve vent in water system. 

02-12-2014, Fit Pipe In Wellhouse, Install Valve

02-12-2014, Dietrich Idaho Water Project. Fit pipe in wellhouse, install motorized butterfly valve. 

02-13-2014, Install Mueller Thermal-Coil Meter Vaults

02-13-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults

02-17-2014, Install Mueller Thermal-Coil Meter Vaults

02-17-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller coil type meter vault. 

02-18-2014, Install Mueller Thermal-Coil Meter Vaults

02-18-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults. 

02-19-2014, Install Mueller Thermal-Coil Meter Vaults

02-19-2014, Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller Thermal-Coil meter vaults

02-20-2014, Clean Jobsites, Install MXUs

02-20-2014, Dietrich Idaho Water Project. Attempted to install Sensus OMNI Turbo (T2) 2'' meters but gaskets were not included with the assembly's. Clean job-sites around town. Install MXUs for Sensus iPerl radio read meters. 

02-21-2014, MXUs, Install Large Meters

02-21-2014, Dietrich Idaho Water Project. Install Sensus OMNI Turbo (T2) 2'' meters. Install MXUs for Sensus iPerl radio read meters. 

02-25-2014, Construction Meeting

02-25-2014, Dietrich Idaho Water Project. Monthly construction update & inspection meeting with Kathy Uker Region IV, Brian Reed Department of Environmental Quality, Justin Walker Keller Associates, Jake Claridge Extreme Excavation, Iva Lee Green Dietrich Idaho. 

02-26-2014, Install Fire Department Meter

02-26-2014, Dietrich Idaho Water Project. Install fire department water service. Measure for new vents at wellhouse. Install brackets for pipe support at wellhouse. 

02-27-2014, Install Highway Department Meters

02-27-2014, Dietrich Idaho Water Project. Install highway department water service. cut holes for new vents at wellhouse. Install butterfly valve & fit pipe at wellhouse. Install fence corner posts at wellsite. 

02-28-2014, Install School Irrigation Meter

02-28-2014, Dietrich Idaho Water Project. Install school irrigation meter. Install city park meter. Install vents in city wellhouse. 

03-03-2014, Install Wellsite Fence

03-03-2014, Dietrich Idaho Water Project. Mix & pour concrete for corner posts for fence at wellsite. 

03-04-2014, Install Wellsite Fence

03-04-2014, Dietrich Idaho Water Project. Install fence at wellsite. 

03-05-2014, Finish Wellsite Fence

03-05-2014, Dietrich Idaho Water Project. Finish fence at wellsite. 

03-06-2014, Well House Upgrades

03-06-2014, Dietrich Idaho Water Project. Well house upgrades. 

03-07-2014, Electricians Working In Wellhouse

03-07-2014, Dietrich Idaho Water Project. Electricians working in wellhouse installing conduit. 

03-10-2014, Electrician Working In Wellhouse

03-10-2014, Dietrich Idaho Water Project, Electrician working in wellhouse. 

03-11-2014, Installing Grounding Rings

03-11-2014, Dietrich Idaho Water Project. Installing grounding rings. 

03-14-2014, Electrical Work In Wellhouse

03-14-2014, Dietrich Idaho Water Project. Electrical work in wellhouse. 

03-17-2014, Eyewash, Shower Assemble

03-17-2014, Dietrich Idaho Water Project. Eyewash, shower assemble in wellhouse. 

03-18-2014, Redo Inlet Vent In Wellhouse

03-18-2014, Dietrich Idaho Water Project. Redo inlet vent in wellhouse. 

03-19-2014, Shower Plumbing, Electrical Work

03-19-2014, Dietrich Idaho Water Project. Shower plumbing, electrical work in wellhouse. 

03-20-2014, Electrical and Plumbing Work

03-20-2014, Dietrich Idaho Water Project. Electrical and plumbing work in wellhouse. 

03-22-2014, Shower, Eyewash Copper Plumbing

03-22-2014, Dietrich Idaho Water Project. Shower and eyewash copper plumbing in wellhouse. 

03-24-2014, Wire Generator, Main Panel

03-24-2014, Dietrich Idaho Water Project. Wiring generator and main panel in wellhouse. 

03-25-2014, 3 Phase Power Hookup, Construction Meeting

03-25-2014, Dietrich Idaho Water Project. 3 phase power hookup, in wellhouse and construction meeting. 

03-26-2014, Install Well Pump and Motor

03-26-2014, Dietrich Idaho Water Project. Install submersible well pump & motor. 

03-27-2014, Install Well Pump, Take Water Samples

03-27-2014, Dietrich Idaho Water Project. Install submersible well pump & motor, take water samples. 

03-28-2014, Paint Air Valve Vent, Install Screen

03-28-2014, Dietrich Idaho Water Project. Paint air valve vent, install pump to waste screen. 

03-29-2014, Flushing Dirty Water From New Well

03-29-2014, Dietrich Idaho Water Project. Flushing dirty water from new well. 

03-30-2014, Flushing Dirty Water From New Well

03-30-2014, Dietrich Idaho Water Project. Flushing dirty water from new well. 

03-31-2014, Microparticulate Analysis Testing

03-31-2014, Dietrich Idaho Water Project. Microparticulate analysis testing of water from new well. 

03-31-2014, Plumbing Repairs

03-31-2014, Dietrich Idaho Water Project. Plumbing repairs at wellhouse. Attempting to hide plumbing leaks by slathering goop over pipe fittings. 

04-01-2014, Wiring Cummins Generator

04-01-2014, Dietrich Idaho Water Project. Bobby Seaton from Rocky Mountain Cummins wiring Cummins generator at wellhouse. 

04-02-2014, Flushing Dirty Water From New Well

04-02-2014, Dietrich Idaho Water Project. Flushing dirty water from new well. 

04-05-2014, Documenting Water Backflow Into well #1

04-05-2014, Dietrich Idaho Water Project. Documenting water backflow into well #1. 

04-05-2014, Flushing Dirty Water From New Well

04-05-2014, Dietrich Idaho Water Project. Flushing dirty water from new well. 

04-07-2014, Electrical Work In Wellhouse

04-07-2014, Dietrich Idaho Water Project. Electrical work in wellhouse. 

04-08-2014, Electricians Installing Electrical Panel

04-08-2014, Dietrich Idaho Water Project. Electricians installing electrical panel in wellhouse. 

04-08-2014, Plumbing Leaks In Wellhouse

04-08-2014, Dietrich Idaho Water Project. Plumbing leaks in wellhouse. Covering leaks with goop didn't stop leaks. 

04-09-2014, Electricians Running Wire Through Conduit

04-09-2014, Dietrich Idaho Water Project. Electricians running wire through conduit in wellhouse. 

04-09-2014, Documenting Water Backflow Into Well #1

04-09-2014, Dietrich Idaho Water Project. Documenting water backflow into well #1. 

04-10-2014, Electricians Installing Electrical Panel

04-10-2014, Dietrich Idaho Water Project. Electricians installing electrical panel in wellhouse. 

04-10-2014, Flushing Dirty Water From Well #2

04-10-2014, Dietrich Idaho Water Project. Flushing dirty water from well #2. 

04-13-2014, Backflow of Chlorinated Water Into Aquifer

04-13-2014, Dietrich Idaho Water Project. Document backflow of chlorinated water into aquifer from well 1. 

04-14-2014, Electrical Work In Wellhouse

04-14-2014, Dietrich Idaho Water Project. Electrical work in wellhouse. 

04-15-2014, Remove Old Power Meter

04-15-2014, Dietrich Idaho Water Project. Remove old power meter at wellhouse. 

04-16-2014, Program PLC and Alarm Dialer

04-16-2014, Dietrich Idaho Water Project. Program plc & alarm dialer in wellhouse. 

04-17-2014, Meeting With Jeremiah and Randy

04-17-2014, Dietrich Idaho Water Project. Meeting with Jeremiah & Randy. 

04-18-2014, Air In System, Empty Pipe error

04-18-2014, Dietrich Idaho Water Project. Dietrich wellhouse air in system empty pipe error. 

04-18-2014, Plumbing Leaks Fixed

04-18-2014, Dietrich Idaho Water Project. Plumbing leaks fixed in wellhouse. 

04-22-2014, New Water Leaks In Wellhouse

04-22-2014, Dietrich Idaho Water Project. New water leaks in wellhouse. 

04-23-2014, Check Meter For Well #2

04-23-2014, Dietrich Idaho Water Project. Check meter for well #2, flushing dirty, smelly water from well #2 

04-25-2014, Test Run Generator At Wellhouse

04-25-2014, Dietrich Idaho Water Project. Bobby Seaton from Rocky Mountain Cummins test running generator at wellhouse. 

04-25-2014, Water Leak In Wellhouse

04-25-2014, Dietrich Idaho Water Project. Water leak in wellhouse. 

04-29-2014, Replacing Pump and Motor For Well #1

04-29-2014, Dietrich Idaho Water Project. Replacing pump & motor for well #1. 

04-29-2014, IDWR Crew Testing Meters

04-29-2014, Dietrich Idaho Water Project. IDWR crew testing meters at wellhouse. 

04-29-2014, Over-Torqued Fasteners Yielding On Check-Valve

04-29-2014, Dietrich Idaho Water Project. Over-torqued fasteners yielding on check-valve in wellhouse. 

04-29-2014, Leaky Plumbing In Wellhouse

04-29-2014, Dietrich Idaho Water Project. Leaky plumbing in wellhouse. 

04-29-2014, Pump Dirty, Smelly Water To Waste For Well #2

04-29-2014, Dietrich Idaho Water Project. Pump dirty, smelly water to waste for well #2. Took sample to show IDWR. 

04-30-2014, Remove Well Pump #1

04-30-2014, Dietrich Idaho Water Project. Remove well pump #1. 

05-01-2014, Load Test Generator, Install New Pump

05-01-2014, Dietrich Idaho Water Project. Load test generator, install new pump. 

05-02-2014, Install Pump Discharge Head & Pump Motor

05-02-2014, Dietrich Idaho Water Project. Install pump discharge head & pump motor. 

05-03-2014, Flush Dirty Stinky Water to Waste From Well #2 7:00 am

05-03-2014 Dietrich Idaho Water Project. Pump dirty stinky water to waste from well #2 7:00 am. 

05-03-2014, Flush Dirty Stinky Water to Waste From Well #2 5:00 pm

05-03-2014 Dietrich Idaho Water Project. Pump dirty stinky water to waste from well #2 5:00 pm. 

05-04-2014, Water Leak Bubbling Out Of Ground

05-04-2014, Dietrich Idaho Water Project. Water leak bubbling out of ground. 

05-04-2014, Flush Dirty Stinky Water to Waste From Well #2

05-04-2014, Dietrich Idaho Water Project. Pump dirty stinky water to waste from well #2. 

05-05-2014, Wire Pump Motor For Well #1

05-05-2014, Dietrich Idaho Water Project. Wire pump motor for well #1. 

05-05-2014, Flush Dirty Stinky Water to Waste From Well #2

05-05-2014, Dietrich Idaho Water Project. Pump dirty stinky water to waste from well #2. 

05-05-2014, Water Leak In Wellhouse

05-05-2014, Dietrich Idaho Water Project. Water leak in wellhouse. 

05-06-2014, Prelube Valve Delivery

05-06-2014, Dietrich Idaho Water Project. Prelube valve delivery. 

05-07-2014, Reprogram Meters, Fix Broken Water Pipe

05-07-2014, Dietrich Idaho Water Project. Reprogram meters, fix broken water pipe. 

05-08-2014, Prelube Port Installed

05-08-2014, Dietrich Idaho Water Project. Prelube port installed. 

05-09-2014, Startup Meeting For New Wellhouse

05-09-2014, Dietrich Idaho Water Project. Startup meeting for new wellhouse. 

05-10-2014, Reprogram Programmable Logic Controller

05-10-2014, Dietrich Idaho Water Project. Reprogram programmable logic controller. 

05-11-2014, Meter Not Registering Backflow For Well #2

05-11-2014, Dietrich Idaho Water Project. Meter not registering backflow for well #2. 

05-12-2014, Irrigation Repair Partially Fixed Flooding Problem

05-12-2014, Dietrich Idaho Water Project. Irrigation repair partially fixed flooding problem. 

05-12-2014, Pump To Waste System

05-12-2014, Dietrich Idaho Water Project. Pump to waste system. 

05-13-2014, Irrigation Ditch Water Flooding Repair

05-13-2014, Dietrich Idaho Water Project. Irrigation ditch water flooding repair. 

05-14-2014, PLC Display and Well Controls

05-14-2014, Dietrich Idaho Water Project. PLC display & well controls. 

05-16-2014, Check Meter Backflow Reading For Well #2

05-16-2014, Dietrich Idaho Water Project. Check meter backflow reading for well #2. 

06-02-2014, Reprogramming Programmable Logic Controller

06-02-2014, Dietrich Idaho Water Project. Reprogramming programmable logic controller. 

06-04-2014, System In Both Low & High Alarm At Same Time

06-04-2014, Dietrich Idaho Water Project. System in both low & high alarm at same time. 

06-13-2014, Wild Fire By Dietrich Idaho Well House

06-13-2014, Dietrich Idaho Water Project. Wild fire by Dietrich Idaho well house. 

06-13-2014, Range Fire By Dietrich Idaho Well House

06-13-2014, Dietrich Idaho Water Project. Range fire by Dietrich Idaho well house. 

06-15-2014, Well #2 Controls Evaluation

06-15-2014, Dietrich Idaho Water Project. Well #2 controls evaluation. 

06-15-2014, Well #1 Controls Evaluation

06-15-2014, Dietrich Idaho Water Project. Well #1 controls evaluation. 

06-16-2014, Generator Fault, Low Temperature

06-16-2014, Dietrich Idaho Water Project. Generator fault, low temperature. 

06-18-2014, Chlorinator On With Well Pumps Off

06-18-2014, Dietrich Idaho Water Project. Chlorinator on with well pumps off. 

06-18-2014, Negative Flow Not Showing On Flow Meter For Well #2

06-18-2014, Dietrich Idaho Water Project. Negative flow not showing on flow meter for well #2. 

06-18-2014, Chlorinator Pump Running With Well Pump Off

06-18-2014, Dietrich Idaho Water Project. Chlorinator pump running with well pump off. 

06-18-2014, Programmable Logic Controller Operation Evaluation

06-18-2014, Dietrich Idaho Water Project. Programmable logic controller operation evaluation. 

06-20-2014, Checking To See If PLC Is Displaying Proper Data From transducers

06-20-2014, Dietrich Idaho Water Project. Checking to see if plc is displaying proper data from transducers. 

06-20-2014, Programmable Logic Controller Programming Followup

06-20-2014, Dietrich Idaho Water Project. Programmable logic controller programming followup. 

06-25-2014, Reprogram Programmable Logic Controller

06-25-2014, Dietrich Idaho Water Project. Reprogram programmable logic controller. 

06-25-2014, Pump Dirty, Smelly Water To Waste For Well #2

06-25-2014, Dietrich Idaho Water Project. Pump dirty, smelly water to waste for well #2. 

06-26-2014, Replace Prelube Valve For Well #1

06-26-2014, Dietrich Idaho Water Project. Replace prelube valve. 

06-27-2014, PLC Programming Evaluation

06-27-2014, Dietrich Idaho Water Project. PLC programming evaluation. 

06-28-2014, Check Well Water Level Transducer

06-28-2014, Dietrich Idaho Water Project. Check well water level transducer. 

06-28-2014, Prelube Valve Check

06-28-2014, Dietrich Idaho Water Project. Prelube valve check. 

06-28-2014, Low Flow PLC Meter Check Pump #1

06-28-2014, Dietrich Idaho Water Project. Low flow plc meter check pump #1. 

06-28-2014, Lag Pump Starting

06-28-2014, Dietrich Idaho Water Project. Lag pump starting. 

06-28-2014, Full Flow PLC Meter Check Pump #1

06-28-2014, Dietrich Idaho Water Project. Full flow plc meter check pump #1. 

06-28-2014, Chlorinator Alarm Check

06-28-2014, Dietrich Idaho Water Project. Chlorinator alarm check. 

06-29-2014, Water Storage Tank Fire

06-29-2014, Dietrich Idaho Water Project. Water storage tank fire. 

06-29-2014, Pump #2 Running As Lead

06-29-2014, Dietrich Idaho Water Project. Pump #2 running as lead. 

06-29-2014, Chlorine Pump Running With No Water Flowing To Tank

06-29-2014, Dietrich Idaho Water Project. Chlorine pump running with no water flowing to tank. 

07-04-2014, Check Valve Failure At Wellhouse

07-04-2014, Dietrich Idaho Water Project. Check valve failure at wellhouse. 

07-10-2014, Electricians Replacing Failed Parts At Wellhouse

07-10-2014, Dietrich Idaho Water Project. Electricians replacing failed parts at wellhouse. 

07-15-2014, Sign US Code Title 42 Section 300i-1

07-15-2014, Dietrich Idaho Water Project. Warning sign for wellhouse US Code Title 42 Section 300i-1. 

07-17-2014, Well Meters Output Range 4 to 20 mA

07-17-2014, Dietrich Idaho Water Project. Well meters output range 4 to 20 mA. 

07-22-2014, Replace Turbine Pump Shaft Bearings

07-22-2014, Dietrich Idaho Water Project. Replace turbine pump shaft bearings. 

07-22-2014, Generator Warning Pccnet Device Failed 2895

07-22-2014, Dietrich Idaho Water Project. Generator warning pccnet device failed 2895. 

07-23-2014, Bridge Repair Screws Pulling Out

07-23-2014, Dietrich Idaho Water Project. Bridge repair screws pulling out. 

07-23-2014, Microparticulate Analysis Testing Well #2

07-23-2014, Dietrich Idaho Water Project. Microparticulate analysis testing well #2. 

07-24-2014, Microparticulate Analysis Testing Well #2

07-24-2014, Dietrich Idaho Water Project. Microparticulate analysis testing well #2. 

07-26-2014, Out Of Level Water Meter Vault

07-26-2014, Dietrich Idaho Water Project. Out of level water meter vault. 

07-27-2014, Microparticulate Analysis Testing Well #2

07-27-2014, Dietrich Idaho Water Project. Microparticulate analysis testing well #2. 

07-28-2014, Microparticulate Analysis Testing Well #2

07-28-2014, Dietrich Idaho Water Project. Microparticulate analysis testing well #2. 

08-04-2014, Homeowner Finishing Sloppy Meter Grading

08-04-2014, Dietrich Idaho Water Project. Homeowner finishing sloppy meter grading. 

08-08-2014, Vibration From Pump #1 After Bearing Replacement

08-08-2014, Dietrich Idaho Water Project. Vibration from pump #1 after bearing replacement. 

08-18-2014, Prelube Union Water Leak

08-18-2014, Dietrich Idaho Water Project. Prelube union water leak. 

09-17-2014, Well #1 Startup Dietrich Idaho Wellhouse

09-17-2014, Dietrich Idaho Water Project. Well #1 startup Dietrich Idaho wellhouse. 

09-19-2014, Prelube Union Water Leak

09-19-2014, Dietrich Idaho Water Project. Prelube union water leak. 

09-20-2014, Flushing Fire Hydrants

09-20-2014, Dietrich Idaho Water Project. Flushing fire hydrants. 

09-21-2014, Water Leak At Dietrich Wellhouse

09-21-2014, Dietrich Idaho Water Project. Water leak at Dietrich wellhouse. 

09-24-2014, Chlorinator Running With No Water Flowing To Tank

09-24-2014, Dietrich Idaho Water Project. Chlorinator running with no water flowing to tank. 

10-31-2014, Counter Reset Fail On PLC In Dietrich Wellhouse

10-31-2014, Dietrich Idaho Water Project. Counter reset fail on plc in Dietrich Idaho wellhouse. 

11-03-2014, Pump Start Counter Fail Dietrich Wellhouse PLC

11-03-2014, Dietrich Idaho Water Project. Pump start counter fail Dietrich Idaho wellhouse plc. 

11-04-2014, Flow Register Fail On Dietrich Idaho Wellhouse PLC

11-04-2014, Dietrich Idaho Water Project. Flow register fail on Dietrich Idaho wellhouse plc. 

11-04-2014, Pump Start Counter Fail Dietrich Wellhouse PLC

11-04-2014, Dietrich Idaho Water Project. Pump start counter fail Dietrich Idaho wellhouse plc. 

11-05-2014, Pump Start Counter Fail Dietrich Wellhouse PLC

11-05-2014, Dietrich Idaho Water Project. Pump start counter fail Dietrich Idaho wellhouse plc. 

12-23-2014, PLC Programing Dietrich Idaho Wellhouse

12-23-2014, Dietrich Idaho Water Project. PLC Programing Dietrich Idaho Wellhouse.