Dietrich Idaho Water Project 02-18-2014 install meter vaults.
02-18-2014 Dietrich Idaho Water Project. Replace meter vaults and water meters with Sensus iPerl meters, and Mueller coil type meter vault.
8:00-8:15: Oscar getting two Deere 50D's started & ready to dig GL Turner service.
9:00-12:00: Digging Turner.
9:30: Digging Turner.
10:00: Smoothing Ballard service, getting ready to hammer rock at Turner.
10:15: Hammering rock at Turner, plumbing meter vault.
10:30: digging Turner.
10:45: Plumbing Turner.
11:00: Turner plumbing done, meter in, water on, backfilling.
11:15: Turner done, heading to Rick Hiatt service.
11:30: Digging Hiatt.
12:00: Hit rock at Hiatt.
1:00-5:00: Hammering rock at Hiatt, digging Wayne Ellis.
1:15: Hammering Hiatt, digging Ellis.
1:30: Hammering Hiatt, digging Ellis.
2:00: Hammering Hiatt, digging Ellis.
2:15: Plumbing Ellis, hammering Hiatt.
2:30: Ellis plumbing done, meter in, water on, hammering Hiatt.
2:45: Hammering Hiatt, repair electrical conduit at Ellis.
3:15: Ellis conduit repaired, backfilling.
3:30: Backfilling Ellis, digging Hiatt.
3:45: Ellis done, digging Hiatt.
4:00: Plumbing Hiatt, digging school DLC.
4:15: Plumbing Hiatt, digging DLC.
4:30: Plumbing Hiatt, digging DLC.
4:45: Hiatt plumbing done, meter in, backfilling, hit rock at DLC.
5:00: Hiatt done, hammering DLC.