Dietrich Idaho water project 04-01-2014 wiring cummins generator.
04-01-2014 Dietrich Idaho water project. wiring cummins generator.
7:00-7:30: Gathered filter out of canister and placed in plastic bag with about 100-200 ml of water from canister, reading ended at 9640 gallons on Sensus ¾ x ⅝ meter, serial #66189398 for a total of 550 gallons run through filter in 19.5 hours.
11:30-1:15: Deliver sample to lab for analysis.
3:00-3:15: Bobby Seaton from Rocky Mountain Cummins wiring generator at wellhouse.