Dietrich Idaho Water Project 04-08-2014. Electricians installing electrical panel.
04-08-2014 Dietrich Idaho Water Project. Electricians installing electrical panel.
5:00-5:15: am Turned pump on so tank would be full when electricians turned off power later on.
9:30-9:45: Electricians turned power off at wellhouse, water in high alarm, getting ready to swap out electrical panels.
10:15-11:00: Electricians swapping out electrical panels.
12:00-12:30 Electricians wiring electrical panels.
3:30-4:00: Finished installing circuit breaker panels, turned power back on.