Dietrich Water Project 04-09-2014. Electricians running wire through conduit.
04-09-2014 Dietrich Water Project. Electricians running wire through conduit.
5:00-5:15: am Turned pump on so tank would be full when electricians turn off power later on, video meter showing heavy backflow of water into wellshaft.
9:00-9:30: Electricians turned power off at wellhouse, water in high alarm, working on wiring.
10:15-11:00: Electricians running wire through conduit, called Justin & Chuck about needing permission to swap out service for existing well pump motor.
12:30-1:00: Electricians wiring meters, running wire through conduit.
1:30-2:00: Electricians running wire through conduit.
3:00-3:30: Electricians running wire through conduit, getting ready to turn power back on.