Dietrich Idaho Water Project 04-23-2014. Check meter for new well.
04-23-2014 Dietrich Idaho Water Project 04-23-2014.
Pump dirty water to waste. Check meter for new well.
3:00-4:00: Ran new well to waste for 45 minutes, noticed dirty water was stinky, smelled like rank, scummy, stagnate swamp water, water did clear up after a few minutes and looked potable, ran water to the tank, checked water flow on new meter, flow appeared to average about 235 gpm.