Dietrich Idaho Water Project 06-27-2014. Evaluating programmable logic controller programming setup.
06-27-2014 Dietrich Idaho Water Project. Evaluating Dietrich Idaho city water pump station programmable logic controller programming setup.
10:00-10:30: Did first evaluation of plc since reprogramming on the 25th, plc interface shows pump #1 flowing 362 gpm with the pump off & not running, it shows pump #2 flowing 10 gpm with the pump off & not running, both pumps read as having gone through 3 cycles; it appears the pumps are now running alternately.